Chemical industry

Petrochemia Blachownia S.A. in Kedzierzyn Kozle

Scope of work : workshop drawings, prefabrication, delivery and assembly of the steel construction along with a workshop design for the needs implied by the construction of the extraction distillation installation, including extraction distillation section for BT fraction, two technological trestles and a cable trestle.
Quantity 250 tons.
Realisation time : start April 2006,
finish July 2006.