Infrastructural construction

Ring road of Strzyzow City within the Road no 988

Scope of works: participation in the consortium, and acting as general contractor for the task of building a more than six kilometres long city ring road, according to the rule “design and build”. In this scope of works are 25 engineering objects: five bridges (three bridges over the River Wislok, one over the River Stobnica and one over the Stream Różanka), road viaducts and culverts.
Realization time: start January 2017,
finish October 2019.