Construction of a new bridge over the Odra River along track No. 1 of railway line No. 132 in Opole

Scope of work:.  fabrication, delivery and assembly of the steel structure of the bridge at km 100,106 of the railway line No. 132 track no. 1 with a weight of over 900 tons. The length of the structure is 179m; the maximum span over the water is 103.7 m.

Realisation time: start March 2023.
Finish: March 2024.