Infrastructural construction
Bridge in Poznan over Warta river within the route of the A-2 speedway
Scope of work : delivery and assembly of the load-carrying structure for the bridge in amount of 3100 tons, anti-corrosive protection of the construction supply and assembly of the inspection trolley on bridge.
Realisation time : start March 2000
finish July 2002.