Reconstruction of the bridge along the B 158 road over the Oder-Havel canal in Oderberg, Germany
Scope of work: fabrication, delivery and assembly of the steel structure of an arch bridge over the HOW canal along the B 158 road, weighing 326 tons.
Realisation time: start July 2023,
finish: May 2024.